Title: Heuristic approaches for Multi objective Multi resource constrained project scheduling problem
Researcher: Tripathy, Bibhuti Bhusan
Guide(s): Ganapathy, L
Keywords: Heuristic approaches, multi objective, multi resource constrained projects
Upload Date: 22-Jul-2013
University: Symbiosis International University
Registration Date: 13/07/2010
Abstract: This research consists of solution of different type of RCPSP. Firstly, it is aim to compare the heuristic algorithms and performance for medium and large sized project networks with resource constrained project scheduling problems and robust scheduling. The project with multi mode activity execution aim is to minimize the project duration by choosing the activity priority and their execution mode. Secondly this research proposes a genetic algorithm for finding an efficient optimal or near optimal algorithms to the RCPSP and need for a global search approached to the problem. Thirdly the aim is to develop an algorithm for cost time trade-off and resource availability in stochastic PERT network by crashing the project activities for minimization of duration with limited resources. newline
URI: http://hdl.handle.net/123456789/1465
Appears in Departments:Faculty of Management

Files in This Item:
File Description SizeFormat 
tripathi bibhuti.pdfAttached File789.34 kBAdobe PDFThumbnail
View/Open


Items in Shodhgangotri are protected by copyright, with all rights reserved, unless otherwise indicated.